Monday 31 March 2008

mostly DIY Wind Turbine

Have modified things a bit

Beefed up base (now the crossbracing is two 24 inch post spikes per leg) and tower now includes extra 12 feet of scaffolding pole.

















Alternator now mounted to scaffolding jack to form a yaw bearing, and tail added. Now waiting for 10 ft diameter commercial fibreglass blades from Texas.